In transition bend, type 1 flow in the single pipe is placed to the left.
Application
Transition bends are used for perpendicular transition from single pipe to TwinPipe.
Transition bends are available in type 1 and type 2, both have fixing bar at the TwinPipe end.
The flow pipe is always placed at the bottom.